Stormwater Management Plan study for a 55 ha property subdivided into 16 lots at average 3.3ha each.
Three Streams passing through this property. A numerical hydraulic model was setup and ran to assess the hydraulic characteristics of those streams. Road side Ditch and Culverts as well as detention ponds were studied for this project.